+86-373-8614444
Hydraulic Rail Clamp For Crane

Hydraulic Rail Clamp For Crane

The hydraulic rail clamp is a safety device that prevents the machine from moving freely in the direction of the rail. Rail clamps are used for rail-mounted cranes, such as bridge cranes and gantry cranes. The rail clamp can prevent wind and external impact from the influence of these devices....

Description

The hydraulic rail clamp is a safety device that prevents the machine from moving freely in the direction of the rail. Rail clamps are used for rail-mounted cranes, such as bridge cranes and gantry cranes. The rail clamp can prevent wind and external impact from the influence of these devices.

When the equipment stops running, the rail clamp will automatically clamp the rails so that the equipment will not be blown away by the wind. When the equipment is running, the hydraulic device opens the rail clamp to make the equipment run smoothly.


ZYTJX Series Hydraulic Rail Clamp

Product model: ZYTJX-120, ZYTJX-250

Applicable rails: P38, P43, P50, QU70, QU80, QU100, QU120

Anti-slip force: 120~250KN


Outline and installation dimension

OUTLINE AND INSTALLATION DIMENSION

Advantage:

1. Compact structure and beautiful appearance.

2. The clamp base and the clamp base support are floating connection, which meets the deviation requirements of the crane.

3. The special design of the gripper (patented product) increases the friction coefficient and improves the wind resistance.

4. The limit switch and the operating mechanism are interlocked for protection to ensure the safe operation of the crane.

5. The hydraulic station components can be configured according to your needs: self-made or imported.

Hydraulic Rail Clamp For Crane

Hydraulic Rail Clamp

FAQ:

Q1. Are you a trading company or a factory?

We are a factory specializing in crane brakes and related products.

Q2. What is the minimum order quantity?

1 set.

Q3. Do you have a guarantee for your product?

Yes, we have a one-year warranty.

Q4. How do you control your products?

1. The warehouse has advanced equipment and professional quality control personnel.

2. The factory will test the quality samples before shipment. Our quality control (QC) will check the quality of each product before shipment.

Q5. How long will it take for delivery after payment?

Usually 7-15 days, 15-30 days for large orders. The specific time needs to be confirmed according to your requirements.

Q6. How will you deal with quality complaints?

1. We will reply to customers within 24 hours.

2. If it is confirmed that the product has quality problems, we will make corresponding compensation.

Hot Tags: hydraulic rail clamp for crane, China, manufacturers, supplier, factory, customized

Send Inquiry

(0/10)

clearall