Installation Method of TYWZ2-300 Foot-Operated Hydraulic Drum Brake
The installation of the TYWZ2-300 requires following standardized steps including pre-installation preparation, mechanical fixing, hydraulic system connection, and post-installation debugging to ensure stable braking performance. Below are the detailed and actionable steps:
1. Pre-Installation Preparation
1.1 Component & Parameter Confirmation
Verify the brake model (TYWZ2-300) matches the crane's large-car operating mechanism, and confirm the brake drum diameter (300 mm) aligns with the equipment's rotating shaft specifications.
Inspect all components for damage: check the brake body, foot hydraulic pump, high-pressure oil pipes, seals, manual brake lever, and high-strength bolts for cracks, deformation, aging, or oil leakage (replace damaged parts immediately).
Confirm the hydraulic oil type: use DB-25 hydraulic oil for ambient temperatures of -20℃ to 50℃; switch to YH-10 aviation hydraulic oil for temperatures below -20℃.
1.2 Installation Environment & Tool Preparation
Ensure the installation position (crane's large-car operating mechanism) is dry, clean, and free of oil stains or rust. Reserve ≥20 cm of space around the brake for maintenance and heat dissipation.
Prepare tools: torque wrench (0–500 N·m), feeler gauge (0.01–1 mm), cleaning cloth, hydraulic system-specific sealant, adjustable wrench, funnel, degreasing agent, and a level.
1.3 Surface Cleaning
Thoroughly clean the brake's mounting surface (on the crane) and the brake drum's friction surface with a dry cloth. Use degreasing agent to remove stubborn oil stains-impurities will affect installation firmness and braking friction.
Polish minor rust on the brake drum surface with fine sandpaper; replace the drum if there are deep grooves, cracks, or excessive runout (radial runout ≤±0.2 mm, end runout ≤±0.3 mm as standard).
2. Mechanical Installation (Core Step)
2.1 Fix the Brake Body
Lift the TYWZ2-300 brake (net weight ≈56 kg) and install it vertically at the preset position of the crane's large-car operating mechanism (use a level to check; vertical deviation ≤±1° to ensure uniform hydraulic force transmission).
Align the brake's mounting holes with the equipment's reserved holes. Use 8.8-grade high-strength bolts (matching the reserved hole specifications) and tighten them in a diagonal sequence to the specified torque (250–300 N·m for M18 bolts, 350–400 N·m for M20 bolts) to ensure even clamping force.
After fixing, shake the brake body gently to confirm no looseness or tilting.
2.2 Install the Brake Drum
Mount the brake drum onto the equipment's rotating shaft, ensuring a tight fit with the flat key (no gaps or slipping). Use a dial indicator to verify coaxiality: radial runout ≤±0.2 mm, end runout ≤±0.3 mm (adjust or replace the drum if exceeding limits).
Ensure the brake drum's friction surface is centered with the brake shoes (no eccentricity) to avoid uneven wear during braking.
2.3 Assemble the Manual Brake Device
Install the manual brake lever on the brake body's reserved interface. Fasten the connecting pins and cotter pins to prevent detachment.
Test the manual lever: pull it to confirm it can smoothly drive the brake shoes to clamp the drum; release it to ensure full rebound (no stuck positions), which serves as an emergency backup for hydraulic system failures.
3. Hydraulic System Connection
3.1 Connect Oil Pipes
Connect the high-pressure oil pipe (equipped with the brake) between the brake's hydraulic cylinder interface and the foot pump's oil outlet. Ensure the pipe is not twisted, kinked, or stretched tightly (reserve slight slack to avoid damage during equipment movement).
Apply hydraulic system-specific sealant to the pipe joints (avoid excess sealant entering the oil circuit). Tighten the joints with an adjustable wrench-ensure no leakage, but do not over-tighten to prevent thread damage.
3.2 Inject Hydraulic Oil
Open the oil filler cap on the foot pump. Use a funnel to inject the matched hydraulic oil until the level reaches the "MAX" mark on the sight glass (do not overfill to prevent overflow when the system is pressurized).
Screw the oil filler cap tightly to prevent dust or moisture from contaminating the oil.
3.3 Bleed Air from the Oil Circuit
Keep the brake in the released state. Loosen the air release valve on the brake's hydraulic cylinder by 1–2 turns.
Slowly step on the foot pump repeatedly (15–20 times) until oil flows out of the air release valve without bubbles. Tighten the valve immediately while holding the foot pump slightly pressed to maintain system pressure.
Repeat the bleeding process 2–3 times to eliminate residual air-air in the oil circuit will cause weak braking or delayed response.
4. Post-Installation Adjustment & Testing
4.1 Adjust Brake Clearance
Use a feeler gauge to measure the gap between the brake shoes (both sides) and the drum. The standard clearance is 0.3–0.5 mm.
Adjust via the adjusting bolts on both sides of the brake: turn clockwise to reduce the gap, counterclockwise to increase it. Ensure the gaps on both sides are equal (difference ≤0.1 mm) to avoid uneven lining wear and unstable braking.
4.2 Functional Test (No-Load)
Foot Brake Test: Step on the foot pump gradually-confirm the brake engages smoothly with increasing pedal force, and the rotating drum stops stably without jitter or abnormal noise. Release the pedal: the brake should release immediately, and the drum rotates freely.
Manual Brake Test: Pull the manual lever to verify the drum is locked tightly; release it to confirm the brake returns to the released state.
Leakage Check: After 15 minutes of pressure retention (foot pump half-pressed), check all oil pipe joints and the hydraulic cylinder for leakage. Wipe the surface and recheck to ensure no oil seepage.
4.3 Load Test (On-Site Verification)
After no-load testing passes, conduct a load test with the crane's rated load (50% → 75% → 100% load step-by-step).
Verify the brake can stop the loaded equipment smoothly within the specified distance (no sliding or delayed braking). Check the pedal force: it should be labor-saving and consistent, without sudden changes in resistance.
5. Final Inspection & Documentation
Recheck all fasteners (mounting bolts, oil pipe joints, manual lever pins) for tightness; retighten if loose.
Clean the brake surface and surrounding area to remove oil stains or debris.
Record installation details: model, installation date, hydraulic oil type, brake clearance data, and test results for future maintenance reference.